The project is a new greenfields mine development for Rio Tinto (RTIO), located 35km northwest of the Yandicoogina mine in East Pilbara mining region. The Gudai-Darri mine will initially be developed as a nominal 43Mpta high-grade, dry processing operation.

PARC Engineering was engaged by Laing O’Rourke to support the new process plant construction at Rio Tinto’s Gudai-Darri mine, located in Western Australia’s Pilbara. PARC Engineering supplied Laing O’Rourke with an experienced construction team from Engineering and HSE through to Supervisors, Skilled and Semi labour to assist with the construction of the RTIO Gudai-Darri project.

Results
  • PARC Engineering supplied technical resources including Engineering and Project Supervision to assist peak manning periods and drive the completion of the works to a high standard.
Additional Statistics
  • Successful integration into the client’s project team with a positive outcome for the project and a satisfied client.
  • Achieved all works LTI

Number of people on site:

  • Peak workforce over 70 employees on site

LTI Free statistics:

  • LTI Free

Other Projects

PARC Engineering working at the Kwinana Waste to Energy facility
Minerals and Resources

Waste to Energy (W2E) Project

View Project
Iron Bridge Wet Process Plant Construction
Minerals and Resources

Iron Bridge Wet Process Plant Construction

View Project
PARC Engineering team walking on site
Minerals and Resources

Beyondie Sulphate of Potash

View Project